infrastructure and transport

Ga East Assembly Demolishes Waterway Structures

The Ga East Municipal Assembly has begun demolishing hundreds of unauthorised structures built in waterways. This action aims to reduce flooding. It will allow for the free flow of stormwater. The exercise targets areas vulnerable to heavy rainfall.

Ekow Quansah ·

The Ga East Municipal Assembly has started removing buildings constructed in waterways. This effort aims to stop flooding and safeguard people and property during the rainy season. Hundreds of unapproved structures are being targeted. These buildings were built in areas meant for water flow. The operation is part of a larger plan. It enforces building rules and helps stormwater drain better.

Officials told JoyNews that many buildings block drainage channels. These structures are in flood-prone locations. One official from the National Disaster Management Organisation (NADMO) explained the danger. The affected area collects floodwater from surrounding communities. Heavy rains cause it to overflow easily. Water rises significantly, flooding nearby homes and roads. Removing these obstacles will help water pass freely.

This action fits into Ghana's ongoing challenges. Accra often faces severe flooding. This is linked to poor urban planning. Many buildings occupy natural drainage routes. Climate change exacerbates these issues. Extreme weather events become more common. The Ga East Assembly's move signals stronger enforcement. This is a common theme in urban development discussions. It highlights the cost of unplanned construction.

A NADMO official involved stated the goal. "We are doing this so that the water can move freely from the upper sections through the channel," they said. Residents have also voiced their struggles. They confirm that flooding makes movement difficult. One person noted that new buildings worsened the problem. "After the building was put up there, I realised that it was contributing to the flooding," a resident said.

The assembly plans to continue these demolitions. More unauthorised structures will be removed. This intensified effort shows a commitment to managing flood risks. Authorities will monitor the impact on drainage. Future urban planning will need to account for these actions. Residents should avoid building in these sensitive areas.

Tags: Ga East Municipal Assembly Flooding Demolition Waterways NADMO Urban Planning

Source: StatsGH — Ghana's data-driven news platform